SXF5402GXFGY200/B1 Mercedes Benz 20T Liquid Supply Truck
The SXF5402GXFGY200/B1 is a Mercedes Benz 20T liquid supply truck built on an 8×4 chassis. It serves city fire brigades that must refill pumpers away from a hydrant. Three tanks carry at least 6800L, 7000L and 6600L of water in PP composite material, and the crew cab seats 2 including the driver. The 8×4 layout spreads the liquid load.
The liquid supply system, model GL300, is rear mounted and rated at 1500L/min at 0.5MPa. It draws from a water absorption depth of at least 3m and starts in 50s or less, so a shuttle can be turned around quickly at a drafting point. The V6 engine develops 351kW and the truck runs at 95km/h.
Overall dimensions are within 12000mm by 2550mm by 3650mm, and full load weight is within 37900kg. That keeps the vehicle inside typical urban road limits. The compartment is complete aluminum material and never rust, and the tanks are PP composite. Painting is red or other color, and the vehicle is designed for city duty rather than off road work.
Because the pump is rear mounted, the truck can back up to a draft site and discharge to a pumper without repositioning. The three tank sections let a crew draw from one while another is being filled. The shuttle keeps moving on a long incident, and the driver stays in the cab between fills, so the cycle repeats quickly.
Full specifications
| Brand Name | CXFIRE |
|---|---|
| Certification | CCC |
| Model Number | SXF5402GXFGY200/B1 |
| Manufacturer | CXFIRE |
| Warranty | 1 Years |
| Max Speed | 95km/h |
| Product Name | Liquid Supply Lruck |
| Chassis | 8×4 |
| Size | Large |
| Power | 351kW |
| Engine | V6 |
| Highlight | China Factory Liquid Supply Truck,Mercedes Benz Liquid Supply Truck,20T Liquid Supply Truck |
| Model | GL300 |
| Rated pressure | 0.5MPa |
| Rated flow | 1500L/min |
| Water absorption depth | ≥3m |
| Startup time | ≤50s |
| Installation form | Rear mounted |
Where it fits
For water shuttle operations in districts without adequate hydrants, where a 20T payload, a 1500L/min rear pump and fast drafting keep front line pumpers supplied through a long incident and across a wide district.






